how calculate bench mark errors
Answers were Sorted based on User's Feedback
Answer / sandy
i think answer is
sigma f.s.- sigma b.s.= Last r.l.- first r.l.
Is This Answer Correct ? | 6 Yes | 0 No |
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
What is the meaning of unit weight of cement?
What are the main reasons for conducting pull-out tests for soil nails?
difference b/w stress and strength
What's mean fe of steel?
1 Answers Fernas Constructions,
How to calculate the sand and aggregate in concrete
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
What is full form of SNF base in concrete mix design for admixture percentage?
What is the release of lien?
What is the purpose of the gap in the road on this bridge?
mix proportion of M20 AND what are different grades below it
6 Answers B L Kashyap, L&T, Panchshil Infrastructure,
As shown in IS 456-2000 minimum cement content is include fly ash?