what type of drawing used in the field construction?
Answer Posted / tukuna das
RFC (Ready For Construction )
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Explain the Strength of brick?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
Scaffolding IS code NO.
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
How to calculate quanty of steel in four leg stirrups?
difference between fc and fc'?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
what is the 0 value in quantity surveying
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
how to conversation of all construction material in to brass
How many lbs are there in a yard?
What is the release of lien?
what is difference between GTS bench mark and temporary bench mark
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..