Cut Linten (RCC-1:2:4)on 10" wall - what should be the
width and hight of cut Linten? Secondly, 1 X 1.6 foot,4"
thick window sun/rain shed (Chajja)should consume
steel,Cement, sand and Stone chips?
No Answer is Posted For this Question
Be the First to Post Answer
Why we select pile foundations
Construction joint of beam & slab is provided at––
what is the procedure of wet seiving. n percentage of silt in different type of soil?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
whatis the banafit of water leak detection and repair?
how to calculate the bricks in 100yard
What is the outturn of Ceiling plastering
how many days we should curing for plastering,brickwork,concrete?
10 Answers Al Faraa, Alfaraa, CCCL, Consolidated Construction Consortium Limited, Wipro,
how i get all type of short type question answer about civil engg
what is weight ratio for concerete grades M5 to M40
what type of surveying is used for inaccessible area??
3 Answers Keti Construction, Rites,
what is meant by hidden beam & purpose of hidden beam
2 Answers Carwell Construction, NTDC,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)