is it compulsory to cast columns along with beams & slabs for
monolithic joints



is it compulsory to cast columns along with beams & slabs for monolithic joints..

Answer / sajin m

That's not compulsory. But when casting separately the joint should be free from loose materials.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate the chair reinforcement length in slabs, footing or anywhere??

0 Answers  


What are the different methods for drawing an arc?

0 Answers  


Percentage of wastage of cement ? Please mention IS code and clause from where I get it.

1 Answers  


What is the technical name for aggregate stored in trepizoidal shape near railway station.

4 Answers  


How to calculate 1 brss for RCC work  

0 Answers   Allied Group, Jyoti Structures Ltd,






why wire mesh is used in plastering

6 Answers  


How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.

1 Answers   Aparna Constructions,


How to fix steel in rectangular footins? I.e first along the length or first along the width??

1 Answers   NKG Infrastructure,


What is the difference between gray swr pipe & red swr pipe

1 Answers  


How do we calculate the power of centrifugal pump?

0 Answers  


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

0 Answers   L&T,


providing, fixing, removal of pockets of size 100*150*300mm to 500*600*1000mm for foundation. the shuttering material used for making &fixing of pockets shall be removed by the contractor without damaged to pockets. if any damage occurred, the same shall be rectified by the contractor is to handover the pockets to forge shop engineer with proper marking of centre lines, levels etc.

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)