Percentage of wastage of cement ? Please mention IS code and clause from where I get it.
CROSS SLOPE OF Macadam Construction
what is the bearing capacity of hard rock
what is tensile strength?
Define What are the reasons for geotechnical site investigations in Uganda?
what motivates you to do a good job
1 Answers Flextronics, HPCL, ISRO,
Please let me know what is the simplest way of Calculating Mix Designs
What are the advantages of cad software’s?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Cost control in civil construction as well as Quality control
to construct 1450 rft length of 6 feet wall how much cement sand and blocks are required????
what else we can add rather than admixture in concrete to reduce the cement quantity?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)