How to calculate 1 brss for RCC work
No Answer is Posted For this Question
Be the First to Post Answer
what happened if the diameter of capillary tube is double then the capillary rise will be
Manpower required for de shuttering of conccrete slab
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
What is the difference between nominal mix and design mix?
What is the neutral axis depth factor formula
why distibuters used in rcc slsb
What is the distance between railway tracks?
why red bricks used for brickbat coba
1) why bent up are provided at l/4 or l/5 distance not at l/8or l/10? 2) why extras are provided in beams at top and why upto 0.3l distance max.? 3) why chairs are provided in two way slab?
standard sand use?
Why we are using coarse sand for brick work and is there any technical problem if, we use fine sand instead of coarse sand.
Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)