The document / drawing that is primarily used in depicting the
“Bill of Materials (BOM)” of piping system is the
Answers were Sorted based on User's Feedback
Answer / guest
The document which incorporate the "BOM" and which is also
used for the installation guide for piping is "installation
diagram" or "hook-up diagrams"
Is This Answer Correct ? | 1 Yes | 1 No |
what is the differnce between PLC & DCS
Gas equation
control valve in manual/auto mode huntting checked spring tention also it is ok.positioner also good condition & incoming inst air line also constant pr.kindly give us correct answer?
is manifold required for an integral orifice meter?
is motorized valve closed when power shutoff?
hi vishok this is noor plz tell me what type problems will occured i use T/C in the place of RTD in (FEED WATER TANK),plz send ur e-mail address to my ID (mail2noor.hyd@gmail.com)
What is 3 selection available when configure the burnout protection for controller
0 Answers EI Electrotechnical Institute,
If we increase PI controller what will be action.
Why upper weighing limit of electronics balance is 90% of the total weighing capacity?
how to calculate signal cable sizing? and multipair cable sizing??explain in brief?
I have flow transmiter DP range is 0 to 5000mmwc,(convert) Display to be show in m3/Hr.
How to force the bit in GE Mark V?