Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


given a processor batch of 1000 resistors moving on the
conveyor belting in a large factory. the resistors is value
at 10k ohms each but when the resistors reach the quality
control, some of the resistor has been rejected caused by
failure in manufacturing.the high quality measurement is
used to determine the failure. describe the instrumentation
terminology in measurement of a system above with explaining
the important in:-
-reliability
-sensitivity
-repeatability
-precision
-range
-resolution
-linearity
-hysteresis
-error
-accuracy
(answer must related to the scenario above)


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Instrumentation Interview Questions

what is the basic principal of vertax flow meter

3 Answers   Balrampur Chini Mill, Saba,


what is function of sensor, and how is it work , explain with difination

0 Answers   Bapco Bahrain Petroleum Company,


So I'm a first year apprentice and I'm having a tough time with knowing the difference between AI, AO, DI, DO. I'm having a hard time understanding what devices are which and why. Can someone explain this to me?

2 Answers  


can we use flow transmitter instead of level transmitter?

7 Answers  


What is the difference between Analytical instruments and other instruments?

7 Answers   Schenck,


why we use the 4-20 mamp signal used for transmitter.

5 Answers   Tecnimont,


what is The specifications for oriface instalation

0 Answers  


how the 4 to 20 mA signal goes to any controller/indicator,and what is the role of voltage ,12/24 and how to do connection of it, in controller.

1 Answers  


what is function test.

1 Answers   Takreer,


What is PLC(programmable logic control)?

1 Answers  


my data card only does run in my mobile so how can change it that it run other mobile & computer and i can stor data in my data card

0 Answers  


how to calibrate displacer type level transmitter by dry weight method please mention formula for weight calculation

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)