2. In a container filled with each of the following
materials, at a porosity of 40%, determine the upward
gradient required to cause the quick condition (a) Lead
shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c)
Sand with a G = 2.32
No Answer is Posted For this Question
Be the First to Post Answer
Difference b/w tor steel or tmt bar
what is the quantity of sand in litre or in cum using 1 bag cement for morter proportion 1:4.is there consider bulking of sand ?
The concrete slump recommended for beams and slabs; is?
What Are The Different Type Of Slump Test Indications?
Why we take 162.2 in (d*d/162.2) to calculate weight of steel???
As per ratio 1:4:7, how can we calculate the quantity of materials for 1 cum of concreate, pls derive with equation
what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper
what is design mix of M10, M20, M35, M40 grade of conconcrete?
1 Answers ILD, Lok Sewa Aayog, Raheja, Vishwa Infrastructures,
why we leave expansion joint between to complex
Aptitude, reasoning, quants, verbal and technical question
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
Wat is meant by Aecron brick?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)