2. In a container filled with each of the following
materials, at a porosity of 40%, determine the upward
gradient required to cause the quick condition (a) Lead
shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c)
Sand with a G = 2.32
No Answer is Posted For this Question
Be the First to Post Answer
How to provide spacer bar in barbending work,parallel to bar or inclined to bar? What is the reason?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
wat is the necessity of finding shear and bending moment in a structure. wat will happen if it is not consider. other than shear cracks and deflection is there any other failure happen.
What is '43' in OPC43 cement? What is '35' in M35 grade of concrete? Is there any link between them ?
what is the ratio of M10,M20,M30,M40,M50,M60 grade concrete
28 Answers NCC, PWD, SPML, Student,
What are some facts about concrete?
What is the deffrence multistory bulding &highrise bulding
what are the duties of Site Engineer in work site?
0 Answers Amarprakash Developers,
IN LOW RISE BUILDING PER SQ FT HOW MANY MATERIAL REQ. SAND &CONCREATE&CEMEBT
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
How many lbs are there in a yard?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)