what is calculation of cement, snd of 1:4 16mm,12mm plastring
Answers were Sorted based on User's Feedback
Answer / devineni srinivasa rao
calculation for 100 sq mt
quantity=1oox12=1.2
ratio=1+4=5
dry qty to wet qty=1.5
uneven surface=1.8
cement=1.8/5=0.36x1440=520kgs
sand=o.36x4=1.44 cu mt
| Is This Answer Correct ? | 12 Yes | 1 No |
Answer / aabid
12 mm 1.8*1/5 = .36m3
.36*1440 = 520kg
16 mm 2.4*1/5 = .48m3
.48*1440= 691kg
| Is This Answer Correct ? | 0 Yes | 0 No |
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
what is the difference between NP2 Class and NP3 Class RCC Hume pipes
What is the difference in design between Working Stress method & Limit State Method ? Briefly Explain.
what is the meaning of morth
Where do we use singly and doubly reinforced beam in construction purposes
2 Answers Isha Homes, Simplex, Sterling Wilson,
Define What does civil status mean?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
Any body tell me how can we calculate 1m3 quantity of cement sand aggregrate in kg.
sir, i used 43grade opc cement to my wall plastering,i have cured 20 days ,recently , white dots and white powder shades are appearing on walls, is it any defect by curing excess days? have any disadvantages by it ? please answer
1. why more stirrups are provided near the support? 2.where more stirrups is provided in a column and why? 3.why extra bars are provided at the top of beam? 4.what is the difference between overlap and lap lenght? 5.what is development lenght
What is Pavement & carrage way?
providing, fixing, removal of pockets of size 100*150*300mm to 500*600*1000mm for foundation. the shuttering material used for making &fixing of pockets shall be removed by the contractor without damaged to pockets. if any damage occurred, the same shall be rectified by the contractor is to handover the pockets to forge shop engineer with proper marking of centre lines, levels etc.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)