what is the calculation of current when a clampmeter is
attached to two phases of any drives.
Answers were Sorted based on User's Feedback
Answer / pannir
vector sum of two line current would again gives the value
of line current flowing in each phase.
Is This Answer Correct ? | 0 Yes | 3 No |
what is the slip of synchronous motor
what is the mechanism of operation of brushless dc motor why is it more wexpensive then ordinary permanent magnet motors
Pls Breifly explain about UPS (Inverter,Reserve,Rectifier,Float voltage,Boost voltage).
In a three-phase full converter, every SCR conducts for a.60deg. b. 120deg. C.180deg. d.90deg
Why P.F(power factor)relay should not be connected to the D.G(diesel generator) incomer side
Is it possible that Generator trip but Turbine not trip.Give explanation.
What is the meaning of floating point earthing in battery backed systems ?
a battery is having capacity 100AH and 25% charging .if a load taking 10A & connected 6 hour .what is the final condition of the battery.
Which Motor used in Fan's Motor ?
3 Answers Matsui Technologies,
can any tell me how to do wiring connection in L&T 3ph 4wire E301 CT operated energy meter, what is P1,P2,P3,P0. M1,M2,M3, L1,L2,L3.
2 Answers Bhartiya International,
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
1.how to calculate energy units in our home at singe phase, 2.415V,63A wiring what will use thickness of wire