hi,
i have 3x200KVA and 2 x 80KVA UPS with battery bank of
150AH 68Nos. and 100AH 204Nos., i need to install AC either
ductable or PAC type, so can you help me to calculate heat
load and capacity of the AC to install.
No Answer is Posted For this Question
Be the First to Post Answer
how generater works
What is the difference bet ween EDO Type & MDO type ACBs, and what is the advantage EDO Type over than MDO type ACBs.
how to calculate the no. of earth pits required for an electrical installation?
why do we have 230v a.c. as general voltage for domestic supply rather than others?
what happens when a power transformer neutral earthing broken???
Why -48V dc power supply using in telecom field?
What is AMF Panel????
How do you select a cable size(cu and Al) for a particular load
what is the principle of synchronous motors?
how to calculate the cable size in sqmm if load (kw) is given?
why transmission line 11Kv OR 33KV,66Kv not in 10kv 20kv?
43 Answers A2Z Group, Baiji Power Plant Gas, Electrical, HCL, Kirloskar, Mepco, NEPC, OAMC, UNI, University of Lahore,
i need bhel question papers.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)