hi,
i have 3x200KVA and 2 x 80KVA UPS with battery bank of
150AH 68Nos. and 100AH 204Nos., i need to install AC either
ductable or PAC type, so can you help me to calculate heat
load and capacity of the AC to install.
No Answer is Posted For this Question
Be the First to Post Answer
what kind of technical test that i need to learn because i have an interview tomorrow.. please someone help me..
What will be the diameter of pipe between conservation tank and transformer
what is the difference between current voltage transformer and current transformer and where it is used?
what is the ground clearance of 400KV transmission line?
9 Answers Power Grid, wbsedcl,
in our transmisison sub station why we step down firstly 132kv\33kv then 33kv to 11kv. can we direct step down 132kv to 11kv.
How to choose size of the cable w.r.to current carrying capacity ...
What are disadvantages of capacitor
working of bucholz relay of a transformer
how to calculate the ac and dc wire losses with calculations plz tell me
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
tell me the operation of ELCB. How it detects a fault?
what is dc transformer? how it work?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)