Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what are check points to be checked while charging
switchyard?(CT,PT,BREAKER,POWER TRANSFORMER)



what are check points to be checked while charging switchyard?(CT,PT,BREAKER,POWER TRANSFORMER)..

Answer / arun 9865576777

Transformer Commissioning Work


Preliminary Test

1. HT Switchgear End

&#61656; HT BKR IR Value

Open Condition Closed
Condition
R-RI= R-Y=
R-E=
Y-YI= Y-B=
Y-E=
B-BI= B-R=
B-E=


2. Transformer end

&#61656; TRF IR Value
Note: - Neutral earth should be open
LV line PT fuse& earth link open
15sec 60sec 600sec PI
HV-E
LV-E
HV-LV
After the above tests put back neutral earth line pt fuse&
earth link Connection properly.



3. LV Panel End

&#61656; LT BKR IR Value

Open Condition
Closed Condition
R-RI= R-Y=
R-E=
Y-YI= Y-B=
Y-E=
B-BI= B-R=
B-E=


Preliminary Checks

1. HT Switchgear End

&#61656; Check Relay Setting
&#61656; Check Tightness Of CT TB
&#61656; HT Cable Connection
&#61656; Interlock Trial
&#61656; Stability Check
&#61656; BKR Trial In Test Mode
&#61656; Check Fuse
&#61656; Check MTR Operation
&#61656; Reset The All Relay
&#61656; Check Control Supply
&#61656; Reset Max Value On Relay

2. Transformer End

&#61656; TRF Body Earth
&#61656; TRF Neutral Earth
&#61656; HT Cable Connection
&#61656; Check Tightness Of CT TB
&#61656; Check WTI,OTI (or) Door Inter Lock Trial
&#61656; Check OTI,WTI Setting
&#61656; LV Side Flexible Tightness
&#61656; Check Marshalling Box Control Supply



3. LV Panel End

&#61656; Check Relay Setting
&#61656; Check Tightness Of CT TB
&#61656; LV Side Flexible Tightness
&#61656; Check Line PT Fuse
&#61656; BKR Trial In Test Mode
&#61656; Check Control Fuse
&#61656; Check MTR Operation
&#61656; Check U/V Trip Throw Line PT
&#61656; Reset The All Relay
&#61656; Check Control Supply

Before Charging
&#61656; Line PT should be in service
&#61656; LV BKR should be open condition
After TRF Charging
&#61656; Note Down Electrical Parameter In HT Side & LT Side
&#61656; Phase Sequence In LT Side

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

what will happen power cables laid without gap in underground

1 Answers  


all interview questions with answers of ntpc (2000-2009

0 Answers   Hetero, NTPC,


what is the value of current and voltage that our body can resist ?

3 Answers  


Supose we have one 220v A.C fan.if we provide 220v D.C what will be happen?

13 Answers  


what effect will 10 milliampere current cause to human body ???

1 Answers  


What is the major difference between P.T. & C.V.T ? Why CVT is used in HT Transmission line in place of P.T.?

13 Answers   APGenco, OPTCL,


what will be the neutral to earth voltage while checking by the Digital multimete? and why?

1 Answers  


role of shunt coil in circuit breakers

2 Answers  


how to calculate neutrel current

2 Answers  


How is the connection of the tap changer on the HV side been made?

0 Answers  


How to justify this statement ??? "Capacitors in series provide less capacitance but higher voltage breakdown rating for the combination"

0 Answers  


in my observation NCT is used at Karnataka power transmission. why we are not used in andhra pradesh

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)