Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what are check points to be checked while charging
switchyard?(CT,PT,BREAKER,POWER TRANSFORMER)

Answer Posted / arun 9865576777

Transformer Commissioning Work


Preliminary Test

1. HT Switchgear End

&#61656; HT BKR IR Value

Open Condition Closed
Condition
R-RI= R-Y=
R-E=
Y-YI= Y-B=
Y-E=
B-BI= B-R=
B-E=


2. Transformer end

&#61656; TRF IR Value
Note: - Neutral earth should be open
LV line PT fuse& earth link open
15sec 60sec 600sec PI
HV-E
LV-E
HV-LV
After the above tests put back neutral earth line pt fuse&
earth link Connection properly.



3. LV Panel End

&#61656; LT BKR IR Value

Open Condition
Closed Condition
R-RI= R-Y=
R-E=
Y-YI= Y-B=
Y-E=
B-BI= B-R=
B-E=


Preliminary Checks

1. HT Switchgear End

&#61656; Check Relay Setting
&#61656; Check Tightness Of CT TB
&#61656; HT Cable Connection
&#61656; Interlock Trial
&#61656; Stability Check
&#61656; BKR Trial In Test Mode
&#61656; Check Fuse
&#61656; Check MTR Operation
&#61656; Reset The All Relay
&#61656; Check Control Supply
&#61656; Reset Max Value On Relay

2. Transformer End

&#61656; TRF Body Earth
&#61656; TRF Neutral Earth
&#61656; HT Cable Connection
&#61656; Check Tightness Of CT TB
&#61656; Check WTI,OTI (or) Door Inter Lock Trial
&#61656; Check OTI,WTI Setting
&#61656; LV Side Flexible Tightness
&#61656; Check Marshalling Box Control Supply



3. LV Panel End

&#61656; Check Relay Setting
&#61656; Check Tightness Of CT TB
&#61656; LV Side Flexible Tightness
&#61656; Check Line PT Fuse
&#61656; BKR Trial In Test Mode
&#61656; Check Control Fuse
&#61656; Check MTR Operation
&#61656; Check U/V Trip Throw Line PT
&#61656; Reset The All Relay
&#61656; Check Control Supply

Before Charging
&#61656; Line PT should be in service
&#61656; LV BKR should be open condition
After TRF Charging
&#61656; Note Down Electrical Parameter In HT Side & LT Side
&#61656; Phase Sequence In LT Side

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Write the force balance equation of m ideal mass element.

1239


what is the carona effects meaning in HT line transmmission system

2008


what is the voltage regulation for unity and zero power factor?

2306


How does HT work & Voltage required?

2253


how to protect motor in dol starter having capacity of 30 hp.40 hp?

3202


Advantages of using generator circuit breaker (GCB) scheme in a power station ?

5271


What is the typical enclosure type used for Indoor switchgear / Outdoor switchgear Units? - In Onshore / offshore Units?

992


WHY IN AC DRIVES,INPUT PHASE CURRENT SHOW UNBALANCE?

2289


whether starting current is limited to rated current of motor through soft starting or it exceeds the rated current?

1593


what is working process of star delta controlling circuit ?

1872


what is a synchronizing lamp ?

1612


What is the Current equation in series RLC circuits.

1040


how test transfomer(3 phase75kva) by megger

2109


According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor

1960


state the disadvantages of carbon filament???

2931