plz answer the questions, How do you check the quality of
foundation? and What is the key performance area in quantity
survey?
Answer / dinesh.rk
1>as you know the quality (strength)of foundation is assed
by testing that cube specimen and by quality control during
casting the foundation/
2> there is no such a particular area.. what we need is THE
ACCURACY SHOULD BE 100 % IN EACH AND EVERY ITEMS OF WORK/
Is This Answer Correct ? | 7 Yes | 1 No |
what is the difference between built-up area & carpet area? how to calculate this areas?as there are any formula to calculate these areas?
DEAR ALL I HAVE AN OPURTUNITY IN WORK IN AFGANISTAN? MY QUESTION IS WHAT IS THEPRESENT SAFETY POSITION IN AFGAN? HOW IS THE COMMUNICATION AND BANKING FACILITIES IN AFGAN? HOW IS THE CLIMATE ABOUT AFGAN? ANYBODY KNOW ABOUT THE ABOVE DETAIL PLS TO SENT THE ANSWER. IF YOU ARE INTRESTED TO SENT THE ANSWER PERSONALLY PLS TO CONTACT MY MAIL ALSO. @ santhoshselvamani@gmail.com
is there any simple field method to ascertained the bearing capacity of soil (with least arrangement/ Wedge penetration etc...).
why top layer of block work shoud be full size if any cut block adjustable than another layer?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
how to calculate the no of cement bags required for 100sqft of area 12 mm thick plastering in proportion of 1:3,1:4,1:5,1:6?
what is the quantity of concrete required in 1 cubic meter volume without reinforcement
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
what is working drawing?why it is use?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
what is the multiplying factor for diffrent types of pcc/rcc ratios?
How we calculate the service time of buildings