if a pipe those configuration (ASTM c 76 class b 450mm dia
2500mm length) fixing for water course those lining of water
is 7000 running meter.
my question is that if 8 joints of pipe ls leakage and we
have not permission to stop the water so which treatment we
apply on joint in that in condition.
No Answer is Posted For this Question
Be the First to Post Answer
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
How many are the types of joints?
At which temperature in deg Celsius Asphalt is used for the pavement of Roads?
What is geographic meridian?
Define Who designed the city of Washington DC?
yasser arfatcompleted his degree in civil from which university
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
how many quantity of water use in 1cu.m. concrete
What is modular elasticity?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
what is procedure of ordinary pile foundation detial?