if a pipe those configuration (ASTM c 76 class b 450mm dia
2500mm length) fixing for water course those lining of water
is 7000 running meter.
my question is that if 8 joints of pipe ls leakage and we
have not permission to stop the water so which treatment we
apply on joint in that in condition.
No Answer is Posted For this Question
Be the First to Post Answer
In Earth work compaction How u calculate How many liters of water required,for compaction of ordinary soil for one Cu.m.
what is mean by compressive strength
What is the outturn of Ceiling plastering
How can u prepare mix design for concrete?
What is the unit weight of cement?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
how much binding wire is required for one tone steel
20 Answers Gammon, Hinduja, Jindal,
IS code for Rolling Margin of steel
For what purpose bedding is used under storm water drains, explain?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
What are the uses of groynes?