mix design procedure, i.e m15 to m40
Answer / nitin lahane
Site Laboratory Items necessary on site for Mix Design
1. Set of 12 Cube moulds of size 150 x 150 x 150 mm.
2. A slump cone, tamping rod and a scale.
3. Weighing balance of 5Kg. With accuracy of 2gms and corresponding weights up
to 2 gm. Electronic Balance is highly recommended.
4. Spring balance of 100Kgs.
5. Milk cans of 5,2 & 1 litre capacity for addition of water.
6. 250 ml measuring cylinder for silt test.
7. Set of sieves as under:
40mm, 25mm, 20mm, 12.5mm, 10mm along with a Pan & 4.75mm, 2.36mm,
1.18mm, 600 μ, 300 μ, 150 μ, 75 μ along with a pan and lid.
8. Conical cans of 5 lit and 1 lit capacity for calibration.
9. If Weigh Batcher is not available at site, then following Farmas should be made
available at site:
Capacity in litres Nos. L B H Size (in cm)
35 4 40 x 25 x 35
30 1 40 x 25 x 30
25 2 40 x 25 x 25
20 1 40 x 25 x 20
15 1 40 x 25 x 15
10 2 40 x 25 x 10
10. Hot plate
11. Compression testing machine.
12. A yield box of size 50cm x 50cm x 75 cm made of mild steel or plywood.
Is This Answer Correct ? | 4 Yes | 1 No |
How is make concrete cube?
How to evaluate the elastic modulus of soil from the plate load test result? for example ..one of test results are here Max. settement =4.56mm(at 900kPa) Residual settlement = 4.02mm Maximum pressure on soil 900kpa Soil bearing capacity 300kpa Plate diameter=300mm Thickness =25mm Soil description =Grey, clayey silty SAND with gravels and rock fragments
From which end do you start deshuttering in a) cantilever portion b) simply supported portion
what is the crushing strength of good building stone
what is the praposion of M30 concrete mix.
Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so calculate the total cost of labour and also explain in detail...plz ans me immadiately i am hurry Thanx
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
Hai, I have applied for APPSC AEE (I&CAD) post.I need previous AEE papers of civil engineering.I hope u will kindly consider this and send.
what is the unit of heat of hydration?
How and where are aqueducts built?
can u use instead of water milk for concreting
150mm bricks size how many use 4.14 m3