Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
What is the substitute of Mastic Asphalt?
100sqft of 9" (brickwork).. bricks(standard)=no ? sand= cement=
what is the diffrence betwen one way salb & two way salb?
How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0.61 m3
Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
what is meant by structural design?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
how much overlap i must to provide in column 16mm dia bar and if i want to save steel by doing welding then how much over lap must be?
3 Answers Bin Hamda Trading Contracting,
Water filter calculation formula
What is the meaning of M50,20? What is 50,what is 20
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)