plz.show development and anchorage length in simple diagram.
No Answer is Posted For this Question
Be the First to Post Answer
When was the first motorway built in england?
what is mean by bitumen emulsion
The effect of arching the beam is?
plz tell.. how can we find weight(in kg) of 1 cum of m20 mix..? how can we find the ratio of cement sand and agregate on site i.e if we given some amount of m20 mix then hw we find the ratio..?
How much used for sand per square meter in 12mm Thickness
8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the Column drawing please answer give with example,thankyou,
what is the out turn of one masson in plastering, masonary work in 8 hours, with limited healper? what is the out turn of corpender in form work? wood work? in 8 hour with limited healper? what is the out turn of bar bendarin 8 hour with limited healper for slabs, beams, coloumn?
why are you joining in this (applied post) job and your aim for this job
What is different between DI Pipe and CI pipe?
What are the types of concrete
What is an ice dam sock?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?