I am a new valuaer. I am seeking for instruments which r used to locate the site and from where I got it?
Answer / piyush vats
I think you are looking for theodlite instrument
| Is This Answer Correct ? | 0 Yes | 0 No |
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
how to determine pile length and diameter of pile is there any thumb rule?
what is the bar bending schdule
undisturb samples are obtained by direct excavation thin walled sampler thick walled sampler none of this
Civil engineering related
material used for mendrel use to bend epoxy coated rebar
0 Answers Saudi Aramco Shell Refinery Company SASREF,
What is difference between target mean strength and compression strength of concrete?
how do we calculate quantity of gypsum for 1m3? 1m3 = ?kg
What is the main difference between crushing test and impact test in coarse aggregate?
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 + 1 + 1 x 0 = answer??? pzl tell the rite answer ??
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)