Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why shear forces are usually neglected in column design?



Why shear forces are usually neglected in column design? ..

Answer / mohd ahmad

Because column is the
compression member

Is This Answer Correct ?    11 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

I am planning to construction in my plot in Pune (Chandan Nagar) and its near about 1950 SqFt. Can some plz help me on the rate on per sqft for RCC,Brickwork & Plaster,Flooring,Water proofing,Door. Thank you in advance

1 Answers  


Which factor affects the use of GSB material for different types of road works? What makes a material suitable to use for GSB??

1 Answers  


How to check slab shuttering level.? Or check list for slab ?

0 Answers  


i need gate exam civil engineering question papers with answers

0 Answers  


What are causes of cracks in outside plaster of a building and how we prevent it during constructions?

6 Answers  


In BBS,Find out the cutting length for a 2000*2200 column with 50 mm cover?

1 Answers   NKG Infrastructure,


difference between deep and shallow well?

7 Answers  


how to find the percentage for minimum reinforcements as per IS:456 for beam , column, slabs.??

1 Answers   Gammon,


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

0 Answers   L&T,


What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing for M25 design mix conc.?pl give idea with relavant is code

9 Answers   IP Infra Power,


why we are condecting the slump test for concrete?

8 Answers  


22. Are you willing to attend trainings, learn new skills and develop as a professional?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)