For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings
No of footings,length ,Breadth,Height ,qty in cum, at last
unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
No Answer is Posted For this Question
Be the First to Post Answer
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
why cracks develop at the upper corners of doors openings
Why do we use badarpur or crusher sand with coarse aggregate in a concrete mix?
what is the use of water bar in water tank and is this an extra item in estimate?
I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shuttering?
how to find number of 16mm bar reqired for 5m length with 125 mm spacing ?
how much sand requires for Light weight blocks for 100sqft
which software better design in structure design or Rcc design(STAAD PRO,TEKLA STRUCTURE)
Rate analysis of painting
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
In beam where lapping is allowed for top and bottom bars?
1 Answers IOCL, JMC, JMC Projects,
Mention what are the composition of a landfill?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)