Answer / harikiran n gowda
The range of lap length is 48d to 52d . Some structural
consultants prefers 50d.
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / mohammed ifthekhar ahmed
1.5 time the dia of reinforce steel
| Is This Answer Correct ? | 1 Yes | 3 No |
HOw many cement bags are required for M35, M40 & M45 grade of concrete?
how many labour is required for 1cum of concrete?
Prepare a Schedule for a Highrised building from starting stage to Handover?
what is mean by c32/40s concrete class
What is the standard size of a brick used in North India?
what is the ratio of m50 grade in concrete block
which steel is better for residential building tmt steel or hysd steel
How much quantity of cement,sand,stone used to build 1 cum of cc road??
0 Answers Pandey Construction Company,
Weather we heat cement, will it changes its color? if yes why? if no why?
it is possiblee to produce concrete with out cracks...
What is difference between FE-415 and FE-500???
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)