Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why two main buses and one transfer bus scheme not using
for 400kV switchyard

Answers were Sorted based on User's Feedback



Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / rishi

first of all who told u that main and transfer bus is not used in 400 kv substation.This scheme is used in many substations.

Is This Answer Correct ?    14 Yes 2 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / naresh.devarakonda

one and half breaker scheme is more reliable, simple
operation and reduces the no. of isolators, bus.

Is This Answer Correct ?    4 Yes 2 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / furqan ahmad

in one and halfbreker scheme scheme both breaker and bus
maintenance is possible.even though this scheme is costly
as compared to other schemes but becoz of reliability and
redundancy it is usually used for 400 kv switchyard

Is This Answer Correct ?    2 Yes 0 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / jkrocks

DMT scheme is used earlier in 400kV System but all new 400kv ss are made on one & half breaker scheme. it has many advantages over DMT scheme.
more reliable than DMT each time line or ICT remain connected through both buses I & II, reduces numbers of confusing isolator in system, reduce additional bus.
If one bus trip due to any fault , lines are transformer connected to that bus remains charged through another bus by means of Tie CB.

Only disadvantage is that this system require three breaker for 2 lines or transformer.
But It is nothing against lots of advantages of One & Half Breaker Scheme.

Is This Answer Correct ?    2 Yes 0 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / teju

one and half circuit breaker scheme is more reliable than
other schemes, simple operation and reduces the no. of
isolators, some electrical parameters & it is easy to handle.

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

we have two generators different capacity on 15 MW and other 6MW at 11 KV , 15 MW gen. bus short level current 40KA,and 6MW short level current 25KA,, length of cable 100MTR between 6 MW from 15MW gen. for bus coupling . kindly tell any one can we use both NGR OR one NGR from any GEN. BOTH NGR has diff. rating. Tariq pakistan

0 Answers   RYK Mills,


how to measure genset CT coil range?

1 Answers  


What is UJT PNP, NPN transistor & working principles?

1 Answers   TATA,


what is reactive power (MVAR) and how it is control? how it is generate in powerplant?

1 Answers  


Why do we give DC excitation to AC Synchronous motor??

9 Answers   Lance, MBM, Polycab,


when generator of a power plant is not connected to grid , by increasing the mechanical torque speed of rotor increases but when it's connected to load instead of increase in speed current increases , why?

1 Answers  


What are the basic elements used for modeling mechanical rotational system?

0 Answers  


When do you use a VFD motor?

1 Answers  


Why we did not feel electric shock in electric train?

1 Answers   NTPC,


how to calculate the output power of vfd , please help me.

1 Answers  


Under wat condition statcom operates as an inductor for the transmission line?

0 Answers  


What is the difference between isolators and electrical circuit breakers? What is bus-bar?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)