Why two main buses and one transfer bus scheme not using
for 400kV switchyard

Answers were Sorted based on User's Feedback



Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / rishi

first of all who told u that main and transfer bus is not used in 400 kv substation.This scheme is used in many substations.

Is This Answer Correct ?    14 Yes 2 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / naresh.devarakonda

one and half breaker scheme is more reliable, simple
operation and reduces the no. of isolators, bus.

Is This Answer Correct ?    4 Yes 2 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / furqan ahmad

in one and halfbreker scheme scheme both breaker and bus
maintenance is possible.even though this scheme is costly
as compared to other schemes but becoz of reliability and
redundancy it is usually used for 400 kv switchyard

Is This Answer Correct ?    2 Yes 0 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / jkrocks

DMT scheme is used earlier in 400kV System but all new 400kv ss are made on one & half breaker scheme. it has many advantages over DMT scheme.
more reliable than DMT each time line or ICT remain connected through both buses I & II, reduces numbers of confusing isolator in system, reduce additional bus.
If one bus trip due to any fault , lines are transformer connected to that bus remains charged through another bus by means of Tie CB.

Only disadvantage is that this system require three breaker for 2 lines or transformer.
But It is nothing against lots of advantages of One & Half Breaker Scheme.

Is This Answer Correct ?    2 Yes 0 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / teju

one and half circuit breaker scheme is more reliable than
other schemes, simple operation and reduces the no. of
isolators, some electrical parameters & it is easy to handle.

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

why transformer rating comes in kva?

4 Answers   HNG, Tech Mahindra,


what is the difference between Inverter and ups

1 Answers   L&T, MTS,


explain how to protect high rise building from the risk of lighting.

1 Answers  


how to calculate busbar capacity for 1000Kva transformer having22/.433V

2 Answers   Electrical Tech, L&T,


What is the minimum permissive IR value for LT & HT motor for safe starting?

1 Answers   Rukmani,






State the frequency for rc phase shift oscillator?

0 Answers  


what happened if power factor is "1"

9 Answers   Reliance,


why we use taping of transformer on HT side?

4 Answers  


how to calculate the cable size

3 Answers  


What is the recommended voltage gap between Live and Earth and ,Earth and Neutral.If these are exceded what is the solution.

2 Answers  


what is function of pump in DG?

6 Answers   HP,


how we could know that generator running anti clockwise with seeing the rotating direction of prime mover or engine

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)