Why two main buses and one transfer bus scheme not using
for 400kV switchyard
Answer Posted / teju
one and half circuit breaker scheme is more reliable than
other schemes, simple operation and reduces the no. of
isolators, some electrical parameters & it is easy to handle.
| Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
How to calculate energy stored in a capacitance
does the Trivector Meter of three phase automatically takes care of the low power factor and gives the reading accordigly or it does not take care of the Power factor while giving the readings please explain
if a.c supply is given to the motor,, what happen?
Why an ac systems are preferred over dc systems?
What is use of starter and choke in tube light
how indusrial diesel generator work
How one may guess the direction from which the distribution line is incoming if there is no pole plate on poles?
while starting a liquid starter ,is there any volage drop on water/soda on tank.can we touch the tank on starting?
why zero sequence impedance measurement is not applicable for single phase GT
Hi Everyone ! My Name is Hakim ullah khan please i need formula of Cable Rating because i want to calculate by self without check any Table Chart... Thank you.....
What does quality factor depend on in resonance?
what is maxemo work permit procedure
Classify milling machines.
Is it acceptable of installing an earth pit in planters area where bare copper cable, earth rod and connection are susceptible to corrosion due to water?
Why syn. Generators are used for the production of electricity?