Why two main buses and one transfer bus scheme not using
for 400kV switchyard

Answer Posted / furqan ahmad

in one and halfbreker scheme scheme both breaker and bus
maintenance is possible.even though this scheme is costly
as compared to other schemes but becoz of reliability and
redundancy it is usually used for 400 kv switchyard

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

can u give me a brief idea about power line carrier communication ??

1499


What are the difference between CT/PT operated Meter and RRAMR Meter for HT/LT application?

2019


11 kg trivevter meter has rating of -/5amps. And pt ratio11000/110v and is connected with 11kv ct/pt unit of cr ratio 75/5amps. And pt ratio of 11000/110v while checking accuracy of meter with HT Accuchek meter what value of PT ratio and CT ratio to be filled in Accuchek meter

1217


How to check the cable fault / hv test of transformer cable.

1406


Lt motor sfu flashing reasons?

1307






a starter used for squirrel cage induction motor?

1217


which protection used in power plant?

1512


what would happen if reactive power (kvar)is increased (more)or decreased (less)? how much exact reactive power should be maintained? and what should be done for that

1781


what is rating boiler

1569


pls,send the previous year written test questions.

1455


which type of questions asking for solar companies?

1130


explain why core loss of a transformer is almost constant under different load conditions when connected across a constant voltage and constant frequency.

2216


Consider three heater bank connected in 3 phase star with neutral.Each heater bank connected in each phase.So each phase get 230 volts supply.my question is,during balance condition, current flow in neutral or Not

1206


I WANT TO know WHICH WAY IS BETTER FOR CONNECTION BETWEEN POWER TRANSFORMER AND MAIN DISTRIBUTION PANEL. 1-IS BETTER WE USE CABLE? 2-IS BETTER WE USE BUS DUCT? my transformer rate power is 2500KVA

2541


How PADO software increase the efficiency of power plant?

5995