Why two main buses and one transfer bus scheme not using
for 400kV switchyard
Answer Posted / furqan ahmad
in one and halfbreker scheme scheme both breaker and bus
maintenance is possible.even though this scheme is costly
as compared to other schemes but becoz of reliability and
redundancy it is usually used for 400 kv switchyard
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is the difference between c power and U power acb breaker
Has someone here done a sizing for a generator (3 phase), its for a pumping station. If you have an example for standby/duty and both running (I) star delta (ii) Soft Starter.
Give some differences between open loop and closed loop?
What is meant by short-pitched winding?
What is the tube exial fan?
What happens to a motor if it is connected in Delta connection
how to calculate regulation constants for over head lines? and what are the regulation constant for raccoon conductor at different voltage level and different P.F?
diff b/w elcb and rccb
I am about to write exam in RRB bangalore for the post of section engineer.please provide me with previous exam questions
l&t switch FN 63 handle position can we change
What is meant by system?
what is the total power generation in india?
Whether 3 phase induction motorwith 100 hp capacity , Amp 160 for which sensitive earth fault relay , type CTUM 15 can be used?
What are the advantage of free wheeling diode in a full wave rectifier?
What are safety device in vcb and acb?