Why two main buses and one transfer bus scheme not using
for 400kV switchyard
Answer Posted / naresh.devarakonda
one and half breaker scheme is more reliable, simple
operation and reduces the no. of isolators, bus.
Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
sir, i'm preparing for hpcl exam officer trainee pls tell me how the exam ques paper pls pls
What is an automatic controller?
What are the two basic types of transformers?
A d.c. Shunt motor is found suitable to drive fans because they require?
The synchronous machine excitation system explain
What is the current carrying capacity of 0SWG,3SWG,10 & 12 SWG solid bare overhead copper conductors?
Is any generator is developed which is operated with out diesal or other expensive source?
Different STANDARDS (BS, IS, IEC etc) gives different informations on CT specification. How they correspons w r t each other (i.e I mean to say BS provides "knee point voltage" but IS does not, then how can i select CT)
why dc is used in control circuits for MV & LV switchgeras instead of ac
how to calculate mf when meter and cTPT detail are given
Define the term Capacitance and Inductance?
is it value of power factor is more than unit. whats effects in the source supply
Explain the process of commutation in a dc machine.
The electromagnetic torque developed is proportional to what in a D.C series motor?
what is POTT and PUTT explain?