Why two main buses and one transfer bus scheme not using
for 400kV switchyard
Answer Posted / naresh.devarakonda
one and half breaker scheme is more reliable, simple
operation and reduces the no. of isolators, bus.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
what does vector group Dyn11 tell us? also tell me how will u differentiate between phase lead and phase lag thru this vector group
if the armature current in a dc generator is ac ( sinusoidal ) why doesnt the sjhape af armature mmf a sinusoidal (ni) ? armature mmf in case of a dc machine is triangular.
pls tell me function of closing coil of A.C.B.
Dear sir, I completed DECE In the year 1995.Now i am working in a private company from last 10 years as an Electrical supervisor.The company having a 1000 KVA transformer.Now i try to apply "C" Licence. I am eligible or not.If not eligible,pls give solution.
I have 1500/1A CT If i connect this CT in 6.6KV bus bar means what will be the voltage present in CT?
what is sevice settings for mccb?How can be it setted?
if we apply 1000ADC instead of 100ADC or We apply 50ADC instead of 100ADC,What will be happened in the test result value.Pl explain
What are the different power system losses and how can it be eliminated?
What determines the thickness of the lamination or stamping?
ratings of lightning arrester
Write the force balance equation of m ideal mass element.
can i connect wavetrap in 2 different phase in EHV line?
What is the requirement of grounding the neutral of single phase generators on load? If the neutral is not grounded, what will be the effect?
how balanced in star delta connection ?
In HI POT test what is reason for applying the AC VOLTS and DC VOLTS in different applications what is the nessesity for this ?