Why two main buses and one transfer bus scheme not using
for 400kV switchyard

Answer Posted / naresh.devarakonda

one and half breaker scheme is more reliable, simple
operation and reduces the no. of isolators, bus.

Is This Answer Correct ?    4 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir, i'm preparing for hpcl exam officer trainee pls tell me how the exam ques paper pls pls

1788


What is an automatic controller?

655


What are the two basic types of transformers?

633


A d.c. Shunt motor is found suitable to drive fans because they require?

740


The synchronous machine excitation system explain

1333






What is the current carrying capacity of 0SWG,3SWG,10 & 12 SWG solid bare overhead copper conductors?

2968


Is any generator is developed which is operated with out diesal or other expensive source?

1640


Different STANDARDS (BS, IS, IEC etc) gives different informations on CT specification. How they correspons w r t each other (i.e I mean to say BS provides "knee point voltage" but IS does not, then how can i select CT)

1512


why dc is used in control circuits for MV & LV switchgeras instead of ac

1481


how to calculate mf when meter and cTPT detail are given

1365


Define the term Capacitance and Inductance?

662


is it value of power factor is more than unit. whats effects in the source supply

1601


Explain the process of commutation in a dc machine.

609


The electromagnetic torque developed is proportional to what in a D.C series motor?

730


what is POTT and PUTT explain?

2818