Why the height of the bridges over the river are very low?
Answers were Sorted based on User's Feedback
Answer / bhadra
first of all, they will calculate the total catchment area
of certain river. Max. level of water will be considered
from past few years. Based upon that the height of bridge
will be designed. Another point of view is to reduce the
cost of the bridge.
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / charan kumar
To reduce the horizontal stress during maximum water level floating and to retain the shear stability.
Cost of construction was considered after this considerations
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the constant weight of the 6mm,8mm,10mm,12mm,20mm,25mm etc.............dia bars in 1meter
How to calculate Rate of 10 cum of Brick masonary,if the rate of material are as fallow? sand=Rs.500/mt Brick=Rs.5/brick Labour=Rs 300/day Free issue=cement+water+electicity.
what is DLC
about 200 cubic mtr
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???
Can any one give me any link to download civil engineering code in free ?
levelling least count
Explain what is 1/8 on the architect ruler denotes?
What is the difference between undo & redo?
How we decide the the load combinations for design of RCC structures?
Is it possible 18" beam rest on 18" beam and created the junction on beam instead of column?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)