What is ngl level and how it is transfer to column or beam??



What is ngl level and how it is transfer to column or beam??..

Answer / karnam seenu

Natural ground level is a reference level used to mark the floor height for different floors. This can be done by considering NGL as Temporary benchmark and transferring to the column surface or a permanent pillar constructed and maintained till completion of the project since this reference will be taken for all marking of bottom level of slab beams, slab top level, plinth top level, footing top level, etc., by using theodolite instrument or Total station or by simple Dumpy level

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Can fly ash bricks can be used in brick bat coba?

1 Answers  


is there any books available to know the methodology of construction process ( Site Process ) and also find the quantities of all materials used at site.

1 Answers  


what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE

0 Answers  


what is working drawing?why it is use?

3 Answers  


what is anchorage length,lap length and (dont remember the last one)

0 Answers   Bhansali Group,






How much cement ,steel bar, concrete ,required for 416 cum rcc slab

1 Answers   ABC,


the steel diameters(mm) as 6,8,10,12,14,16,18,20,25,28,32...etc these are used in construction work but which mm size can be used for different structural element such as beams,columns,slabs,footing ?

1 Answers   L&T,


where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?

0 Answers  


importance of the soundness test to determine the quality of cement use for any construction

0 Answers  


How can we convert weight batch to volume batch for m30 mix

0 Answers   VKL,


How do you calculate reinforcement weight of steel?

0 Answers  


At present which is the latest and best technology for waterproofing in India 1) Roof waterprofing, 2) Basement waterproofing and 3) Toilet waterproofing

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)