Curing time for 1)R.C.C slab 2)B.W 3)Plastering
No Answer is Posted For this Question
Be the First to Post Answer
Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an example.
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
0 Answers Hashmi Constructions,
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
Ehat slump test of column & retaing wall.
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
How to calculate the rating of airconditioner required in any area,how to calculate the cfm required for any exhaust unit or air washer unit.
6 Answers Changotra Oil Furnace, Dalkia, John Crane,
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
Explination of Expenwion Joints and Construction Joints in Panel casting of Causways?
acceptance criteria for concrete works
what is the I.S. CODE of RCC
Calculation of curtain wall of box culvert
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)