Why the height of the bridges over the river are very low?
Answer Posted / charan kumar
To reduce the horizontal stress during maximum water level floating and to retain the shear stability.
Cost of construction was considered after this considerations
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Which IS Code/American Code applied for coupler test of steel
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
What is construction mitigation management?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
How do you calculate the power of a centrifugal pump?
afe or not
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
What is difference between limit state and working stress method? How it is applies in building structure.
How to calculate the crank rod in slab
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
what is constat for brickwork