what is difference between RCB,RCCB &RCBO?
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
RCB- residual current breaker ,it is same as
RCCB.RCBO-residual current breaker overload (it protects
against overload also)
| Is This Answer Correct ? | 20 Yes | 7 No |
Answer / tushar kanti saha
RESIDUAL CIRCUIT BREAKER(RCB) IS SIMILAR TO RESIDUAL CURRENT CIRCUIT BREAKER(RCCB).
RCCB- IT PROTECTS THE CIRCUIT WITHOUT AN OVERLOAD.
BUT RESIDUAL CURRENT CIRCUIT BREAKER OVERLOAD(RCBO)- IT PROTECTS THE CIRCUIT WITH AN OVERLOAD, MAINLY WHERE WE NEED MORE EARTH LEAKAGE PROTECTION AT THERE RCBO IS USED.
| Is This Answer Correct ? | 15 Yes | 5 No |
Answer / ashmal zadir
RCD is the group name for residual current protective devices.
RCCB is an RCD that fits in the breaker panel
RCBO has additional overload protection and also fits in the breaker panel. RCBOs were mainly designed to protect individual circuits inplace of an MCB. RCCB is used to protect many circuits with individual MCBs
I assume RCB is just another name for RCD. Here is a good link where i found the information.
http://www.cycloflow.com/2014/02/what-are-elcb-rccb-rcbo-and-rcds.html
| Is This Answer Correct ? | 8 Yes | 0 No |
How to dimensioning SDCCH, LAPD and CS7 signaling on GSM?
which type of capacitor store high amount of energy for long time ? ( polarized or unpolarized )
why wound rotor is star-connected?
1 KW = how many kva
Differentiate between real and apparent power?
How the frame size of a flange mounted AC induction motor is calculated?
What is voltage in two phase?
Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
What are the raitings of Mcb,mccb and Acb in detail ??
Why LT cables are not sized based on short circuit capacity.
highest rating of alternator used in india
We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)