What is different between QA and QC
Answers were Sorted based on User's Feedback
Answer / a tester
In simple words:
QA is PROCESS ORIENTED and DEFECT PREVENTION based ,
QC is PRODUCT ORIENTED and DEFECT DETECTION based.
Is This Answer Correct ? | 14 Yes | 1 No |
Answer / tester
QA- Quality assurace is Process based.
It is Defect Prevention Oriented.It is done for
complete product cycle.Ex: Reviews and Audits
QC- Quality Control is product based
It is defect detection and defect correction oriented
It is done after product is build. Ex: software testing
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / ipismita biswal
QA refers to a program for systematic monitoring and
evaluation of various aspects of a project,service or
facility to ensure that standards of quality are being
met.On the other hand QC is a procedure or a set of
procedures intended to ensure that a manufactured product or
performed service adheres to a different set of quality
criteria or meets the requirement of client or customer.
Is This Answer Correct ? | 2 Yes | 2 No |
is it possible tht some one can provide me reading material it would be higly appriciated my email id is svit00ef27@yahoo.com thankx in advance
can u give me the Test case step template and write one test case step (ex)please
how many meeting in realtime environment? what are they?plz explain?
what are the defferent defect statuses?
How would you test a service oriented architecture (soa) web application?
1.Acceptance testing involves procedures for identifying acceptance criteria for interim life cycle products and for accepting them.is that? 2.Acceptance testing occurs only at the end point of the development process; it should be an ongoing activity that test both interim and final products.is it?
How does u integrate the modules before performing Integration Testing?
in compatability and installation testings ,which one is conducted or performed on an application initially
what all the metrics to be checked for a document ?
Should we test every possible combination/scenario for a program?
Hi I am searching job please send some details abuot ERP project and real time test plan,traceability report,test case if any relate to erp project Please help me out to get a job in testing.my email address is chiku_69@yahoo.in Thank u
Difference between the stress and load testing?