As a Test Analyst, what is the first thing you do when you
receive the Functional Spec for a project?
Answers were Sorted based on User's Feedback
Answer / chandra shekar urukonda
First I review the FRS and Identify the scenarios to be
tested and later pre the testcases as per Identified
scenarios
| Is This Answer Correct ? | 9 Yes | 1 No |
Answer / ml narasimhulu
First i have to study Functional Spec
and after iam going to prepare testcases what modules are
allocated to me
| Is This Answer Correct ? | 9 Yes | 4 No |
Answer / @mit
First of all,v read FRS throughly and discuss it with other
Team Members and Test Lead.
Then start preparing Test scenarios and Test Cases.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / hema
Need to go through the functional specification document and need to understand the scope of the project then start preparing test scenarios.
| Is This Answer Correct ? | 2 Yes | 0 No |
What is Scalability Matrix
What methodologies have you used to develop test cases?
What is the difference b/w Smoke and Sanity Testing? I heard that Sanity testing will be done by developers. Is that so?
what is the diff bet SDLC and STLC?
When do you feel that testing should start now while developing an application.
Which one of the functional groups do test engineers interact with in order to retrieve the correct set of requirements for a specific software release?
What is defect density?
10 Answers Qualtree Solutions,
Best Institue for Manual Testig in Ameerpet or SR NAGAR OR MAITHRIVANAM?
What is your daily process? I have 2+EXP IN MANUAL TESTING.PLEASE SUGGEST ME HOW i ANSWER
difference between manual testing and blackbox testing
What is the difference between TEST STRATEGY and TEST PROCESS
3 Answers Tavant Technologies,
When ever u get a build, what type of environment u can deploy it?