I am working in a process industry, in that there are
several sections devided in the SCADA screens and
individual sections may START independently. But sometimes
i am facing problem i.e, if section 2 Stopped by the
operator immediately Section 1 or Section 3 or Section 4 is
getting stopped can you expain the reason behind this?
Answers were Sorted based on User's Feedback
Answer / chandramauli sinha
There r various possibilities:
1. Its a common stop for all sections and are linked at
single command from SCADA screen.
2. Variable of section-1 is linked directly or indirectly
by process/ logic/ variable to other sections. On stopping
of Section-1, the process/logic of other section is
recognizing as fault and stops the respective sections.
please check that is there any link between these
sections...!
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / chandramauli sinha
There r various possibilities:
1. Its a common stop for all sections and are linked at
single command from SCADA screen.
2. Variable of section-1 is linked directly or indirectly
by process/ logic/ variable to other sections. On stopping
of Section-1, the process/logic of other section is
recognizing as fault and stops the respective sections.
please check that is there any link between these
sections...!
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / jigs
It's possible if all sections are in operational interlock. If you stop one then other will be stopped.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / jitendra chauhan
following problem may:
1. Is same interlock may used other sections?
2. have you checked stop command DO of all section, may that same DO?
3. may network getting stop, may PLC going to stop while given to stop command?
4. may that same stop command linked on SCADA?
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sks
this might be due to 2 reasons :
1)scan cycle of the processor has been increased anyhow as
the Dword value is updated after the signal is processed in
module. this extended scan cycle causes difference of
process values on HMI
2) check LAN ports of all stations and also the patch board,
if there is option for redundancy check the healthiness of
redundancy.
Is This Answer Correct ? | 0 Yes | 1 No |
what is the differnce betweeen hart and smart tx
What is meant by calibration
Please asked me How calculate DCS controller memory.
any body please send me the old question papers of ongc test.
i want to know for good instrument engineer or success how many software knowledage required & from which university
Why is the length of cable layyed from RTD to temp. Transmitter should be minimum? Why does heating effect takes place in their?
1 Answers Process Control Technologies,
this site is owned by an nonsense
How to work togather like sov,limit switch,proxy switch and booster in xv
what is novram ic number of foxboro 762cna microcontroller ?thank
how we will install a positioner ?
Lux meter is the measuring device to measure the lux level of lighting fixture. in industrial sector two types of lighting fixture is being used as street lighting purpose 1. HPSV (Sodium) and 2. HPMV (Mercury). HPMV having white light which is an combination of red, blue and yellow colour, while HPSV haivng Yellow lighting. in HPSV red & blue colour will be absent. during measurement of the lux level of HPSV and HPMV fixture. 1. Lux meter can measure the actual lux level of both fixture? 2. or it will show false reading for HPSV fixture light as it has only yellow light present. please give me answer
1. How many output signals do wew have in process control? 2. Could you write down the names of the pre-commissioning and commissioning stage test instruments and explain them (more than 5 items)? 3. What is the first step to commission a transmitter on service? 4. What is RTD? 5. Find the output value in MA of a temperature transmitter (RTD Type) at 120degree celius? 6. What is the O/P signal of a pneumatic transmitter? 7. What is the O/P signal of an elctronic transmitter? 8. What is the close loop and open loon?