I am working in a process industry, in that there are
several sections devided in the SCADA screens and
individual sections may START independently. But sometimes
i am facing problem i.e, if section 2 Stopped by the
operator immediately Section 1 or Section 3 or Section 4 is
getting stopped can you expain the reason behind this?
Answer Posted / jigs
It's possible if all sections are in operational interlock. If you stop one then other will be stopped.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is a half wave, full wave, and bridge rectifer.
Can any body help to get Rsemulator 5000 free from internet if possible then give me any link or any help .
how do i tune dearator pr control valve using PID. we set the set point is 0.6kg/cm2 now i want 0.5 to 0.7kg/cm2 limits so what should i give p,i,d values. then pls explain how do set pid values for control valve tuning?
i have steam drum height 1000mm. and i want to placed the transmitter below the tap.how i calculate.
how can i calibrate the temperatuture gauge used by temperature bath(dry block) i mean step by step procedure?
Draw symbols of the following :
Why upper weighing limit of electronics balance is 90% of the total weighing capacity?
Explain the working of rota meter.
What are the application of bernoulli’s theorem?
what is performance test.need defination
What is 1:1 redundancy ?
Question on maha cement
detail of mass flow meter pricipal
what deference between panel earth and systemearth
Gas equation