I am working in a process industry, in that there are
several sections devided in the SCADA screens and
individual sections may START independently. But sometimes
i am facing problem i.e, if section 2 Stopped by the
operator immediately Section 1 or Section 3 or Section 4 is
getting stopped can you expain the reason behind this?
Answer Posted / jitendra chauhan
following problem may:
1. Is same interlock may used other sections?
2. have you checked stop command DO of all section, may that same DO?
3. may network getting stop, may PLC going to stop while given to stop command?
4. may that same stop command linked on SCADA?
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Tell about your IFFCO plant visit.
What is megering????
Can Any body tell me how to check Modbus Settings in ER300N L&T trivector meter?
How to Calibrate Ultrasonic flow Transmitter in Field
how to calibrate and troubleshooting of leveltroll?
Which type of pressure can be measured by these elements?
Isometric drawings are generated during _________________ phase of a project
what is stroke check for field instument transmetter's & AOV's
Programmable Logic control.
What is the minimum rating availalbe for weld neck orifice in market?
What is furnace draft control?
What is difference of fanuc alpha series 16i and 18i controller.also what is differnce betn TC and MC controller
What happen if we install my pressure transmitter below the elevation of pipe in natural gas service?
what is dc moter.
What is loop1 and loop2 in MTS LT?