What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.
Answers were Sorted based on User's Feedback
Answer / jyoti kumar ghosh
M10: 1:3:6
M15: 1:2:4
M20: 1:1.5:3
M25: 1:1:2
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / swopna
M5-1:5:10
M7.5-1:4:8
M10-1:3:6
M15-1:2:4
M20-1:1.5:3
M25-1:1:2
M30-As per design mix
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / yadagiri
M5- 1:5:10
M7.5-1:4:8
M10-1:3:6
M15-1:2:4
M20-1:1.5:3
M25-1:1:2
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / v.mahesh
m5 = 1:4:8
m10= 1:3:6
m15= 1:2:4
m20= 1:1.5:3
m25= 1:1:2
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / nagendra
M 5 -1:5:10
M7.5- 1:4:8
M10 - 1:3:6
M15- 1:2:4
M20- 1:1.5:3
M25- 1:1:2
M30-m40 design mix followed
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / seshu battula
M5 = 1:4:8
M10 = 1:3:6
M15 = 1:2:4
M20 = 1:1.5: 3
M25 = 1:1:2
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / manoj yadav
M10 =1:3:6 for p.c.c.
M15 =1:2:4 for d.p.c.
M20 - M40 1:1.5:3 colloum,slab,beam
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / pulasthi vishvajith
m10 1:4:8
m15 1:3:6
m20 1:2:4
m25 1:11/2:3
m30 1:1:2
m35,m40 Design Mix Followed
| Is This Answer Correct ? | 14 Yes | 25 No |
Answer / david kamenya
M10 - 1:4:8
M15 - 1:3:6
M20 - 1:2:4
M25 - 1:1.5:3
M30 - 1:1:2
after M30 we have to control the strength
| Is This Answer Correct ? | 74 Yes | 206 No |
What are the causes of building collapse?
What would be the quantity of cement:Sand:Aggregate (1:2:4) requirement for slab casting measuring 1mtr x 1mtr x 0.10 mtr (4 inches)?
hi frnds i hav got thro BHEL written exam..wat to prepare for intervw..guide me plz!!!!!!!!!!!!!
Using 1 lit paint how many sq.ft of wall we can paint. Thanks.
In case of columns the cover is from main steel or from stirrup & which is the IS code mentioned in it?
1m square 20mm plastering how much of water need curing work
What is meant by 'zero value' in quantity surveying.
10 Answers DLS, Gammon, HCC, NCC,
for assembly supported beam main bar are provided at ?
how to calculate spacing rod in column
what is the water cement ratio for plastering
Deduction in length of reinforcement steel for bar bending
While calculating quantity of cement required for 1 qubic meter If mix is m25 1:1:2 =4 1.52/4=0.38, 0.38x1440=547.20 kgs I know 1440 is unit weight of cement And what is 1.52 ? And some one using 1.54 and 1.53 etc... Why they are using can u explain me what is 1.52, 1.53, 1.54?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)