Suppose a new brick wall is being constructed,and the
courses and not aligned horizontally,what negetives can it
cause?
No Answer is Posted For this Question
Be the First to Post Answer
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
difference between deep and shallow well?
Explain what is Hybrid Foundation?
Previous IS steel code?Thanks.
what is the pile
1 Answers Chandra Group, GVR Constructions, Simplex,
Can anyone tell me the salary and job profile of transportation engineers/transport engineer?
what is difference between bending and twisting
Full from of ACC
why curing is necessary?
when we select buildup beam
Anyone have sample questions for bhel please send me since Iam appearing for this exam. Kindly send this to my e-mail: nethaj_babu@yahoo.co.in
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)