what is the least count of staff ?
Answers were Sorted based on User's Feedback
Answer / yfidvi
It depends on the smallest division of the staff,generally
staff's smallest dividion is 10 mm so we can take least
count of 10 mm.
| Is This Answer Correct ? | 0 Yes | 17 No |
Answer / asad
reading on a staff can be taken up to 1mm.
but it is also by experience serveyor.
| Is This Answer Correct ? | 6 Yes | 35 No |
how to calculate rate analysys of 1:6 plastering 10 sq m
What is need for setting limits?
how much difference we have to provide when column steel staggered
what is plum & mass concrete?
how do you stabilize a waterlogged area in road construction
weight of 32mm rod/m
How find out Rolling margin of steel dia.wise?
What is meant by solid geometry?
residential buildings,mixing of concrete,structural,construction material,site handling.
0 Answers Saudi Aramco Shell Refinery Company SASREF,
Used Cement Mortar, Cement & Sand in 1 Square Meter or 1 Square Feet For 10-18mm Thick Plaster ? (1:6) (1:4)(1:3)
to achieve the strength upto m-65 concrete what we should add a)more cement b)silica fume c)marecement with fly ash d)flyash
how to calculate steel in slabs ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)