undistributed samples are obtained by
No Answer is Posted For this Question
Be the First to Post Answer
What is the spacing of chairs in reinforcement steel.If it is written in IS 456:2000 then tell me the page number.
How we decide the depth and size of footing? Give a example?
how pumping of concrete effects the quantity of material used in it?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
what is a louer? and for which purpose it will be used.
What is made from large rocks, which protects the base of cliffs?
what is the weight if 1m3 M25 concrete after setting?
how to calculate shuttering design & position & quantity of props & type of method for succsessful work
tell me quantitys of matal, sand and cement in 1:4:8 and 1:2:4
9 Answers AVL, Infosys, NCC, SPCL, Swapnapurti Developers,
What is the thumb rule for calculating the number of chairs in slab?
which tests for concrete pouring period at the site?
Deshuttering time for slab 6.15 meter
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)