Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.
Answer / arbaz shaikh
16922sq ft=basement,
32022sq ft=super structure rehab
69087sq ft= for sale structure
Scope of work-rcc work,brick(siporex)block work,plaster.
Concrete(m-25 to m-50) -1.25cft.Sqft of bua,(for super structure.
4cft sqft of bua (for basement)
Consumption of steel(fe 550d) -5.5 kg sqft of bua for super structure.
12 kg sqft of bua for basement
What should quotation for this please guyz help me out .?
| Is This Answer Correct ? | 0 Yes | 0 No |
How to calculate the no of bags required for 12mm thick 1:6 plastering?
What Are The Different Type Of Slump Test Indications?
Kindly tell me a book name to study for BIS exam
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
how much shouid be the rate for ready mix concrete per cubic meter
Why the statue of liberty is made of copper?
how to calculate column load bearing? how many weight capacity in 1m3 concrete? pls answere me sir.
how much binding wire is reqd for 1 MT
How much material is required for constructing a 2 Lane 2Km rigid pavement road
how the slump and Compressive Strength of concrete cube is performed in a civil engg lab ?
how much thickness of roof truss?
Any body tell me how can we calculate 1m3 quantity of cement sand aggregrate in kg.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)