How to transport release strategy to production environment?
Answers were Sorted based on User's Feedback
Answer / kamal
Only Config can be transported. Masterdata like class and
characteristics cannot be transported.
Is This Answer Correct ? | 25 Yes | 8 No |
Answer / anandan manoharan
Hi All
Release strategy are like master data , which cannot be transport from one client to other , we have to create in each client , else SAP provides an provision through ALE
i.e
BD91 - Distribute All Characteristics via ALE
BD92 - Distribute Classes via ALE : Send Direct
BD93 - Distribution of Classifications Data via ALE
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / venu
First we transport trs...from dev to production system.
In productionsystem create characters and classes.
Assign classes to release strategy by cl24n
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / rupak
Characteristics and class are classification master date it
can't be transport to the production server except all the
data is possible to transfer from server to other.
Is This Answer Correct ? | 3 Yes | 3 No |
Answer / vivek
Through transport request, transfer from dev. To prod through t.Code se10
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / yogesh h
Following points needs to be done in Development system and
transport to Production system
1. Create characteristic
2. Create Class
3. Create release group
4. Create release code
5. Create release indicator
6. Create the release strategy
Master data needs to be maintain in the production.
Is This Answer Correct ? | 9 Yes | 13 No |
Answer / dinesh
Below mentioned steps are used to transport the Release
Strategy into production server.
1. Create/ include the request in Development server.
2. Release the request in Development server by SE10.
3. Transport the request from development server to
production server with the help of SAP - Basis.
Is This Answer Correct ? | 11 Yes | 16 No |
Answer / prapunporn
Release strategy can be configured manually in ERQ
environment. please help to the way to transport to
production.
Is This Answer Correct ? | 2 Yes | 12 No |
Define “client.”
What is a reference purchase organization? When can it be used?
Q. How do you plan for a vendor rating system and move about?
How is subcontracting used in case of mm?
What is material length & What is the maximum linit to define it?
what is the difference between MB1B,MB1A,MB0A,
How is the vendor return processed without a purchase order reference?
What is the difference between release procedure with classification and without classification and when they used?
In blanket po we do not define the particular deptt where the material consumed, now we do the miro payment settlement , so my question that how to identify the consumed mat after sap that which deptt use this same?
Explain the 'valuation area' concept in mm?
What is the subcontracting cycle?
What is the source of error "not allowed" in case of custom movement type creation?