Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


We are having Chemical earthing pit

the voltage between neutral to earth showing 22V how to
solve that

Answers were Sorted based on User's Feedback



We are having Chemical earthing pit the voltage between neutral to earth showing 22V how to so..

Answer / k.prakashchandra

There is a loose connection in the neutral conductor before
the point of testing. whenever there is a loose connection
in the neutral wire, the neutral point gets shifted to the
point of loose connection.

Is This Answer Correct ?    2 Yes 0 No

We are having Chemical earthing pit the voltage between neutral to earth showing 22V how to so..

Answer / vinod

the neutral earthing in transformer may not be perfect or
brek in neutral from transformer

Is This Answer Correct ?    0 Yes 0 No

We are having Chemical earthing pit the voltage between neutral to earth showing 22V how to so..

Answer / adnan

Hi ,i m new here pleaase correct me if i m wrong i think
The question is not complete questioner did,nt mentioned
that ieutral line s there any electrical load on earthing
point or on neutral wire
please explain the Question

Is This Answer Correct ?    0 Yes 0 No

We are having Chemical earthing pit the voltage between neutral to earth showing 22V how to so..

Answer / tulshiram

Connection of your mesuring equipment to earthing strip is
not proper, First correct connection & then measure it, if
found again please shift your earthing pit postion or
fill/give more water for earthing then meassure.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Please tell me if you are electrical engineer,and you are appointed for the maintainance of Electrical Power plant,then which parts of the plant deal with you.Also tell how these parts/components work.

1 Answers  


what is linear motor?

2 Answers   Lucas TVS, wbsedcl,


What's difference between a400amps lt contactor and a400amps lt circuit breaker

3 Answers   Indian Railways,


generally on the roadside v hav 11kv line which is being step down to 440v line to line....so any1 can tell me which type of transformer they r using whether it is star to delta,delta to star etc...???

9 Answers   Core Solutions,


at present how many EHVAC lines are there in India?

8 Answers   HCL, L&T,


How to run 1ph motor(230 VOLTS its full load amps is 4.5 ampa))with 480 volts main(we didn hav neutral)Thn we go for step down transformer.Our load 10 amps,so we conisder this amps in primary are secondary side?

1 Answers  


What is meant by vector group

0 Answers   GPSC Gujarat Public Service Commission, VA Tech Wabag,


Why iron core losses are constant at all loads in a transformer ?

1 Answers   GATE,


what is the efficiency of thyristor

0 Answers  


I HAVE A INCOMING 100A MCCB TPN 25KA, CABLE LENGHT OF 80M 70MM CABLE SIZE FROM MAIN SUBBOARD TO NEW DB.BASE ON THE FAULT LEVEL SETTING OF 45KA.I WOULD LIKE TO FIND OUT 25KA ENOUGH KA. APPRECIATE IF SOMEBODY CAN ASSIST ME WITH FORMULA FOR THIS. FRM: JEFF

0 Answers  


What is Skin effect of the cable?

8 Answers   L&T,


What are differences between Conventional & Addressable type smoke detectors?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)