We are having Chemical earthing pit
the voltage between neutral to earth showing 22V how to
solve that
Answer Posted / adnan
Hi ,i m new here pleaase correct me if i m wrong i think
The question is not complete questioner did,nt mentioned
that ieutral line s there any electrical load on earthing
point or on neutral wire
please explain the Question
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
In india, according to trade theory above 5 HP motor reqired star delta starter. But we R connect 11 KV motor with 14MW in Direct to line ( With VCB starter combination) Can U Guess, How it is possible ?????
If one tertiary phase i.e. R,Y or B is earthed of a loaded type tertiary delta connected (Without load)of a power auto transformer, what is its advantage/disadvantage?
How to test the vector group of a Yd11 transformer? what are the relations to be checked between various vectors to confirm this vector group?
what is the calculation formula for motor starting torque,running torque, running torque.
Explain (in simple ) - root mean square. whats its role in electrical fundamandal.where its used
Igfet is a
what is PDU in transformer?? which company manufacture??
Define step response?
Why magnetic flux produces an induced current?? what is the detailed procedure ?? ans plz
how to select the mpcbs and contactor for 3 phase 30 hp star delta motors.for plc control.and tell me the calaculation for future use.
There are Two questions about Steam Turbine Generator... What is HRSG bypass of LP, HP used for in power generation? In particualar, in the event that fault of HP bypass, there would be STG TRIP in operation but none on the LP bypass fault...what's the reason ?
What are root loci?
What is “pu” in electrical engineering?
transformer spections :: input voltage 0-110-230v; output volage 0-10-12-14v; amp=3A using CRNO CORE, capcaity=50VA primary turns = ? ; secondry turns =?
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.