We are designer please help me calculate the size of 11kv cables from step up transformer to M.V panel, total load is 5 mega watt distance 900 feet (used aluminum type cables)
please provided formula for calculate the cable with example.
No Answer is Posted For this Question
Be the First to Post Answer
What is difference between 3 point and 4 point starter
1 Answers Genco, Kaltec, TATA,
why dc supply given to ac alternator rotor
what is meant by reactive power ,active power & real power ? thank you
We have one Energy meter for Measuring the voltage,current,power,energy(KWH,KVARH,KVAH) & power factor.The problem is that the meter does not show whether the PF is lagging or leading.So i want to know that is there any way or calculation to find out that whether the PF sign (lagging or leading) depending upon the above mentioned parameters?
explain the meaning of harmonic resonance
What is the speed of 3 phase IM(Induction motor) at no load? How will the Motor meet the increased load(Explain through fundamental)?
what is the procedure to carry out BDV test of a transformer ?
define IDMT relay?
15 Answers APGenco, Bhel, L&T, Shriram Finance,
why voltage is low at reciving end in summer??
for a 400kv t/m line with 10 ampere current will corona occur?
What are the neccessary safety arrangements before commissioning of HV substation?
1 sq mm conductor=? how many amps
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)