Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how many nos of hacking over concrete surface required for
1 sq m area

Answers were Sorted based on User's Feedback



how many nos of hacking over concrete surface required for 1 sq m area..

Answer / busireddyravi

per Sft near about 24 to 28 no of hacking so per one sq mt
near about 260 no of hackings.

Is This Answer Correct ?    61 Yes 13 No

how many nos of hacking over concrete surface required for 1 sq m area..

Answer / karunanit

80 indents per sq ft

Is This Answer Correct ?    14 Yes 1 No

how many nos of hacking over concrete surface required for 1 sq m area..

Answer / sarath babu

80 indents per sq.ft so around 810 indents per sq.mtr

Is This Answer Correct ?    16 Yes 7 No

how many nos of hacking over concrete surface required for 1 sq m area..

Answer / shan

60 to 80 indents per sq.ft

Is This Answer Correct ?    5 Yes 4 No

how many nos of hacking over concrete surface required for 1 sq m area..

Answer / pradip

50 to 55 nos per sq.ft

Is This Answer Correct ?    3 Yes 2 No

how many nos of hacking over concrete surface required for 1 sq m area..

Answer / alagappan

72 to 80 nos per Sq.ft

Is This Answer Correct ?    2 Yes 1 No

how many nos of hacking over concrete surface required for 1 sq m area..

Answer / harshraj

32-36 per square feet.25 mm c/c and 25 mm size of hacking mark.means 50 mm c/c

Is This Answer Correct ?    2 Yes 1 No

how many nos of hacking over concrete surface required for 1 sq m area..

Answer / sutar s d

600 to 700 per sq.mtr

Is This Answer Correct ?    2 Yes 2 No

how many nos of hacking over concrete surface required for 1 sq m area..

Answer / nibas swain

500 no of hacking should be in 1sqm

Is This Answer Correct ?    1 Yes 2 No

how many nos of hacking over concrete surface required for 1 sq m area..

Answer / shabarish ns

60to 801 indents per sq.ft

Is This Answer Correct ?    2 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

what is lap length?

6 Answers   Simplex,


what is the difference between composition of ceramic & glazed tiles?

2 Answers  


Water filter calculation formula

0 Answers   Feathers, TCS,


What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.

0 Answers  


what the length we reduce for 45deg. bend for each side bend of bar.we know the 2d in case of 90 deg. bend.give clarification also?

1 Answers  


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

0 Answers  


How much steel needed for 1 m3 concrete for slab?

5 Answers  


what is ratio of M40?

6 Answers  


what is w/c ratio in dry lean concrete for m10 mix design

0 Answers  


What is difference between FE-415 and FE-500???

3 Answers   Enercon,


Which purpose we use deck anchor in bridges?

0 Answers  


08. 4 main points about check list for Shuttering works are––– 4 i) ii) iii) iv) 09. 4 main points about check list for Concreting works are––– 4 i) ii) iii) iv) 10. 4 main points about check list for Plaster works are––– 4 i) ii) iii) iv) 11. 4 main points about check list for Brick works are–– – 4 i) ii) iii) iv) 12. 3 main points about Project delaying factors are––– 3 i) ii) iii) 13. Write down 60-grade M.S. deformed bar specification. 3 14. 3000 psi concrete means: 1 15. 4 main points about methods of wastage control are–– – 4 i) ii) iii) iv) 16. 1 main point about reasons for your honesty is : 1 17. Water cement mixing in hopper less mixture machine is better than hopper mixture machine because: 1 18. 2 main points about your role during roof casting are–––– 2 i) ii) 19. a. The weight of 3333m deform bar of 24.5 mm dia is…… 1 b. The weight of 300 rft plain bar of dia 1&#61618; is……. 1 20. The types of slumps are––– 3 i) ii) iii) 21. 4 main points about the causes of cylinder failure are––– 2 i) ii) iii) iv) 22. Detection of a beam & a girder are–––– 2 i) ii) 23. Curing is needed for–––– 1 24. The types of slabs in respect of size & shape are––– 5 In respect of size: i) ii) In respect of Shape i) ii) iii) 25. The types of Column in respect of size & shape are–– – 9 In respect of size: i) ii) In respect of Shape: i) ii) iii) iv) v) vi) vii) 26. 3 field tests & 3 Laboratory tests of bricks are––– 6 Field tests: i) ii) iii) Lab test: i) ii) iii) 27. 2 field tests & 1 Laboratory tests of sand are––– 3 Field tests: i) ii) Lab test: i) 28. 1 field tests & 1 Laboratory tests of M.S rod are––– 2 Field tests: i) Lab test: i) 29. a. The % of water absorbs by brick chips: …………… 1 b. The % of water absorbs by Stone chips: …………… 1 30. In respect of design: 5 a. The % of strength gains by concrete in 28 days= b. The % of strength gains by concrete in 14 days= c. The % of strength gains by concrete in 07 days= d. The % of strength gains by concrete in 03 days= e. The % of strength gains by concrete in 28 days without curing =

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)