Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how many nos of hacking over concrete surface required for
1 sq m area

Answers were Sorted based on User's Feedback



how many nos of hacking over concrete surface required for 1 sq m area..

Answer / shabarish

60 to 80 indents per sq.ft

Is This Answer Correct ?    4 Yes 10 No

how many nos of hacking over concrete surface required for 1 sq m area..

Answer / baburao kadam

400+ above

Is This Answer Correct ?    5 Yes 14 No

Post New Answer

More Civil Engineering Interview Questions

polavaram project is situated inwhich place?

8 Answers  


levelling least count

5 Answers   NCC,


why you are selecting the civil engineering

4 Answers   gdcl, Sobha Developers,


how the take measurement at column and beam junction

1 Answers   DMRC,


What is the meaning and full form of FTA and MTA in plumbing material

2 Answers   FTA, L&T, MTA,


How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.

0 Answers   L&T,


you are planning to paint a newly fabricated workshop building made of structural steel of 10 tons total mass.you are require to paint 1 cot of primer and 2 coats of top coat.How many liters of primer and top coat you will request

2 Answers  


Are you good at detailing and explain about the project you have worked on detailing?

1 Answers  


What isthe formula for square

1 Answers   Panchayati Raj Department,


A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx

0 Answers  


Whr should a joint be located in a beam if the provision of a joint is unavoidable??

2 Answers   BMTC,


Why shoring is employed in building industry?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)