how many nos of hacking over concrete surface required for
1 sq m area
Answer Posted / sutar s d
600 to 700 per sq.mtr
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
what are the code used for residental building?
what r you reqired for concrete baching plant?
what is pouring and explain
What is difference between code and standard and specification?
How to find out kg per Sft ?
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
What is the use of extruded feature in solidsworks?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
use ofr concrete as per grade ?
How do you calculate load bearing capacity of a waffle slab?
Which architectural movement is also known as jazz moderna?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
what is the productivity in aluminium shuttering per day