How is calculate the cube molt
No Answer is Posted For this Question
Be the First to Post Answer
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
in construction feild make the column rods are uneven ( e.g 1 column we have 6 nos of bars that 6 nos of bars are varrious level- 1 bar 10';2 bars 9';3 bars 8') what is resion to put different level if difference are required or not?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what is a louer? and for which purpose it will be used.
Target strength = fck +(1.65*4) What is this 4
HOW what is the procedure for using m 50 concrete in columns & M 30 concrete in beams & slabs .
what is w/c ratio in dry lean concrete for m10 mix design
What is the cutting length formula of tringle ring?
hi , can anybody help me about the following doubt...... what is the difference between clear cover, cover and nominal cover to reinforcement ?
how to calculate valuation for the old building?
in which measurment pitot tube is used